Brocade FastIron Ethernet Switch Platform and Layer 2 Swit Manual de usuario Pagina 296

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 454
  • Tabla de contenidos
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 295
FIGURE 59 Beginning of topology change notice
Switch 2 then starts the TCN timer on the Designated ports and sends RST BPDUs that contain the
TCN as follows (Figure 60 ):
Port5/Switch 2 sends the TCN to Port2/Switch 5
Port4/Switch 2 sends the TCN to Port4/Switch 6
Port2/Switch 2 sends the TCN to Port2/Switch 1
Spanning Tree Protocol
296 FastIron Ethernet Switch Platform and Layer 2 Switching Configuration Guide
53-1003086-04
Vista de pagina 295
1 2 ... 291 292 293 294 295 296 297 298 299 300 301 ... 453 454

Comentarios a estos manuales

Sin comentarios